What Schedule 2 actually requires: toilets, washing, drinking water, drying and rest facilities. Who's responsible, what inspectors look for, and what "proportionate" means on a small job.
Read the guide →
Five questions that pick the box: peak crew size, whether the work moves, access, hire length and mains. Plus the sizing mistakes we see most, so you can skip them.
Read the guide →